... Skip to main content

Portland ADU Builder  ·  Now Booking 2026

The second home in your backyard.

Detached, attached, and garage-conversion ADUs by Portland’s design-build team. One firm from permit to certificate of occupancy. Now booking 2026 projects across the Portland metro. Review the City of Portland ADU permitting requirements before you begin.

5.0 ★

Google rating

CCB #181942

Oregon licensed

18+ years

in Portland

Quick Cost Answer

What a 2026 Portland ADU actually costs.

Honest ranges, not single numbers. Unit pricing in Portland tracks five things: foundation type, utility connections, finish level, square footage, and whether the existing structure stays intact.

The real estimate comes after design. We sign a contract on a fixed price, not a guess. No surprise change orders unless you change the scope yourself.

Detached ADU
$250K to $450K

New standalone build, 600 to 800 sq ft. Most full-scope projects: $300K to $385K.

Attached ADU
$200K to $350K

Attached to the primary dwelling. Shared wall, separate entry, separate utilities.

Garage Conversion
$150K to $250K

Existing garage to living space. Reuses foundation and roof. 4 to 6 month build.

Interior Conversion
$120K to $220K

Basement or attic to living unit. Code-compliant egress, separate entry, full kitchen and bath.

Two-on-One Build
$300K to $500K

Second primary dwelling on the same lot. Different rules from standard ADUs.

Itemized estimates within one business day  ·  CCB #181942  ·  Free in-home consultation

Quick Answer

Updated May 2026
Cost in Portland

$350 to $550 /sq ft

Total project: $180K to $450K depending on type, finish level, and site work.

Timeline
10 to 14 mo

Detached. Garage conversions: 6 to 9 months total.

Monthly Rental

$1,800 to $2,800

Long-term lease, 2026 Portland market, 500 to 800 sq ft units.

Property Lift
15 to 25%

Permitted, legally rentable unit vs. comparable home without one.

Our Approach

An accessory dwelling unit should earn its place in the lot before it earns its place in the code. We design every Portland home to read as part of the home, then build it to outlast the next two decades of city policy.

By Type

The five ways to add an ADU in Portland.

Every Portland unit falls into one of five briefs. Knowing which one fits your lot, budget, and goals shapes every later decision: foundation, utilities, code path, timeline. We start there.

Detached backyard ADU cottage built in Portland, Oregon
I.

The Detached

Standalone backyard build. New foundation, separate utilities, 600 to 800 sq ft. The flagship Portland build. Most freedom, longest timeline.

Range
$250K - $450K
Attached ADU sharing a wall with the primary Portland home
II.

The Attached

Shares one wall with the primary dwelling. Separate entry, separate utilities, separate address. Faster than detached, closer to the home.

Range
$200K - $350K
Garage conversion ADU in Portland, Oregon
III.

The Garage Conversion

Existing garage to living space. Reuses foundation and roof. Lowest cost, fastest path to occupancy. Limited by the existing footprint.

Range
$150K - $250K
Basement conversion ADU living space in a Portland home
IV.

The Interior Conversion

Basement, attic, or finished bonus room into a code-compliant unit. Egress, ceiling height, separate entry, full kitchen and bath.

Range
$120K - $220K
Adu Detacted Grey - Woodland Construction Group
V.

The Two-on-One

A second primary dwelling on the same lot under Portland’s RIP rules. Different code path from a standard unit. Maximizes lot value.

Range
$300K - $500K

Choose Your ADU

Four Portland-tested ADU types.

Every lot is different. We design and build the type that fits your zoning, your budget, and the role you want the unit to play. Costs and timelines below reflect 2026 Portland projects.

Detached backyard ADU cottage built in Portland, Oregon
Most Popular

Detached ADU

A separate backyard cottage, up to 800 sq ft. Best resale lift, easiest to rent, most privacy for owner and tenant.

Cost

$280K to $440K

Timeline

10 to 14 mo

Size

500 to 800 sq ft

Rent

$2,200 to $2,800

Attached ADU sharing a wall with the primary Portland home
Best Value

Attached ADU

Shares a wall with the main house but has its own entry, kitchen, and bath. Lower cost than detached because it shares roof, foundation, and utilities.

Cost

$210K to $340K

Timeline

8 to 12 mo

Size

500 to 800 sq ft

Rent

$1,900 to $2,400

Garage conversion ADU in Portland, Oregon
Fastest Build

Garage Conversion

Convert an existing detached or attached garage into a permitted unit. The shell is already there. You pay for systems, finishes, and code upgrades.

Cost

$180K to $260K

Timeline

6 to 9 mo

Size

350 to 600 sq ft

Rent

$1,800 to $2,200

Basement conversion ADU living space in a Portland home
Lowest Cost

Basement ADU

Full or partial basement converted into a separate dwelling. Requires egress, ceiling height, and waterproofing review. Best in pre-1960 Portland homes with daylight basements.

Cost

$160K to $240K

Timeline

5 to 8 mo

Size

500 to 900 sq ft

Rent

$1,800 to $2,400

The Math

Your ADU as a second asset.

The numbers below model a 600 sq ft detached unit in inner-Portland in 2026. Real projects vary. The pattern doesn’t.

Step 01

Build Cost

$245K

600 sq ft detached at $410/sq ft. Includes design, permits, foundation, shell, finish, utility extension, and final inspection.

Step 02

Monthly Rent

$2,400/mo

Long-term unfurnished lease, 2026 Portland market for a permitted detached unit. After 5 to 10 percent vacancy and operating costs.

Step 03

Break-Even

~8.5 yrs

Pure cash recovery, ignoring appreciation and tax depreciation. Many owners refinance within 3 to 5 years to recapture equity.

Step 04

Property Lift

+18%

Average inner-Portland comp lift for a permitted, legally rentable unit on a single lot. On a $750K home, that’s $135K of new equity at completion.

Detached ADU featured build in the Pearl District, Portland
Featured Build  ·  2025

Featured Project

The Pearl District ADU.

The rent covers our property tax increase and half the mortgage. Eight months from contract to keys, no change orders. Their PM ran the city and the trades so we never had to.

D. & M. Henderson  ·  Pearl District Homeowners

720 sq ft

Detached

$275K

All-In

$2,400/mo

Long-Term Lease

2026 Portland ADU Code

What changed for Portland ADUs
this year.

Portland’s ADU code shifted in three meaningful ways at the start of 2026. Knowing them is the difference between a project that pencils and one that stalls.

I.

SDC fee waivers

Portland still waives System Development Charges on the first unit per lot, provided the unit is not used as a short-term rental during the first 10 years. The waiver carries a deed restriction that transfers with sale, so structure your plan accordingly.

$10K to $20K saved

Per project, depending on size + zone
II.

Pre-approved plan sets

The Bureau of Development Services now offers a library of pre-approved plan sets that bypass full structural review. We use them when they fit; we draw custom when site or owner needs warrant. The trade-off is design flexibility versus 6 to 8 weeks off the timeline.

6 to 8 weeks faster

Pre-approved plan permitting
III.

Two ADUs per lot

Most Portland residential zones now allow two ADUs per lot: one attached and one detached, or one converted basement plus one detached cottage. This is the rule that turned single-family lots into small income-producing properties in 2026.

Up to 2 ADUs allowed

Combined attached + detached

The Process

From first walk-through to certificate of occupancy.

Step 01  ·  Day 1

Free on-site consultation

We walk the lot together. Look at setbacks, utilities, sight lines, the realistic path to a code-compliant unit. No pressure, no quote pulled from thin air.

I
II
Step 02  ·  1 business day

Itemized estimate, line by line

The full cost breakdown delivered within one business day. Foundation, framing, utilities, finishes, permits. No mystery line items.

Step 03  ·  Weeks 1-8

Design & selections

Anna leads design. Site plan, elevations, floor plan, fixture and finish selections in the showroom. We lock the spec before any permit is filed.

III
IV
Step 04  ·  Weeks 8-22

Permit review & land use

Tyrell submits to Bureau of Development Services, manages corrections, and clears land use review. We own the timeline through every revision request.

Step 05  ·  Months 6-10

Construction, start to finish

Site prep, foundation, framing, utilities, rough-in, drywall, finish carpentry, paint, fixtures. One PM, one site, one accountable team. Daily clean-up, weekly walks.

V
VI
Step 06  ·  Final inspections

Certificate of occupancy & 1-year warranty

Final inspections clear. Punch list resolved. Certificate of occupancy issued. One-year craftsmanship warranty in writing. We circle back at six months to check finishes.

Charming white cottage surrounded by greenery

Cost Guide

What will your ADU cost?

Know the numbers before you build. Our Portland ADU cost guide breaks down foundation, framing, systems, and finishes so you can size your budget with confidence – tailored to your lot and the unit you have in mind.

Detached, garage & basement ADU price ranges
Line-item breakdown from sitework to final finishes
Interactive calculator sized to your square footage
Detached ADU built in Sellwood, Portland by Woodland Construction Group
Detached ADU  ·  Sellwood, Portland  ·  2025
I.

Featured Project

“We had walked four other contractors through the backyard before WCG. They were the only firm that drew us a real site plan in the first meeting. Eight months later we had a finished unit and our daughter’s family in the back. Quietly excellent.”

M. & J. Sellwood  ·  Sellwood, Portland
Type
Detached
Square ft
780 sq ft
Build
8 months

Frequently Asked

Questions about Portland ADUs.

The seven questions Portland homeowners ask us most often before signing a build. Direct answers, no marketing.

Don’t see your question?

Give us a call. We’d rather answer it directly than make you scroll.

A new detached ADU in Portland costs $250K to $450K in 2026, with most 600 to 800 sq ft builds landing between $300K and $385K. Attached ADUs run $200K to $350K. Garage conversions are $150K to $250K. Interior conversions (basement or attic to ADU) start at $120K. The range tracks foundation type, utilities, finish level, and whether the existing structure stays intact.

A detached ADU takes 7 to 10 months from permit submission to certificate of occupancy. The design and selections phase runs 6 to 10 weeks, permit review another 8 to 14 weeks, and construction 16 to 22 weeks. Garage conversions move faster: typically 4 to 6 months total. Permit timelines depend on the bureau and the complexity of the site, especially for projects on RIP-affected lots.

Yes, every ADU in Portland requires a building permit and most require land use review. Under Portland’s Residential Infill Project (RIP), most R-zoned lots can have one ADU per primary dwelling, with reduced parking and setback requirements. Two-on-one projects (where a second primary dwelling is built) follow different rules. We pull every required permit, manage land use review, and own the timeline through Bureau of Development Services.

Portland ADUs are capped at 800 square feet OR 75% of the primary dwelling, whichever is less. Detached ADUs typically max out at 800 sq ft on standard R-zoned lots. Attached ADUs and interior conversions follow the same total cap but can be configured across multiple floors. Garage conversions are limited by the existing footprint unless you add a second story (which adds 4 to 6 weeks to the design phase).

Yes, with restrictions. Portland allows short-term rentals (Type A and Type B) in ADUs, but you must register the unit with the city, occupy the primary dwelling for at least 270 nights per year, and meet life-safety code (smoke alarms, egress, hardwired CO detection). Long-term rentals have fewer restrictions. We design every ADU to meet both short-term and long-term rental code from day one, so the option stays open.

A detached ADU is a new standalone structure built from the foundation up, typically 600 to 800 sq ft, with its own utilities, kitchen, bathroom, and entry. A garage conversion takes an existing detached or attached garage and converts it into living space, reusing the foundation and roof. Detached costs $250K to $450K and takes 7 to 10 months. Garage conversion costs $150K to $250K and takes 4 to 6 months. The right choice depends on whether you need the garage for parking, the condition of the existing structure, and your budget.

Yes, design-build is the only way we work. The team includes a designer, a structural consultant, a permits coordinator, a project manager, and the trades. Anna Woodland leads design, Tyrell manages the build, and Tyrone signs every estimate. There are no handoffs between architect, designer, and contractor. One firm, one contract, one accountable team from the first sketch to the final inspection.

Service Areas

Building ADUs across Portland metro.

From the Pearl District to Lake Oswego, Beaverton to Sellwood. Local zoning, local lot conditions, local crews on every project.

Ready When You Are

Let’s draw the ADU that fits your lot.

Free in-home consultation. Itemized estimate within one business day. Now booking 2026 projects across the Portland metro.

Start your home remodeling project - request a free estimate
Close project form button