Damp, unfinished Portland basements dried out, framed, and finished into real living space in 2026. See the before and after, the cost ranges, the timeline, and how it came together.
A Portland basement remodel starts with a familiar problem: damp, unfinished square footage sitting under a house that has run out of room. Every basement remodel we deliver follows NARI remodeling standards.
We dry it out first, then frame, insulate, seal, and finish it into living space that works, with a code-compliant egress window where a bedroom calls for it. The before and after below walks one of these West Slope lower levels.
One design-build team handles it all, from the first sketch to the final inspection, with one fixed price after design, before any demolition begins.
Construction & design experience in Portland
Portland-area homes transformed
Across Google, Houzz & Yelp reviews
Workmanship warranty on every basement
A bare, unfinished West Slope basement, dried out, framed, and finished into a warm family room in 2026, shown before and after. Below it, selected finished basements across the Portland metro: family rooms, built-in bars, and lower-level lounges. We gave the work room to breathe.






A Portland basement remodel runs $147K to $385K in 2026. Where you land depends on the size, whether you add a bedroom or bath, and how much moisture and structural work the basement needs. The table below shows what that range covers.
| Project | What it includes | 2026 Range |
|---|---|---|
| Finished basementPortland 2026 | From finished open living space (moisture control, framing, insulation, drywall, flooring, and lighting) up to a full lower-level suite or basement ADU with a bedroom, a bath, waterproofing, egress, and premium finishes. | $147K to $385K |
Ranges reflect a 2026 Portland metro basement remodel. A basement ADU, egress excavation, or structural work moves a project toward the top of this range.
Most of the schedule is locked before demolition. The phases below show a realistic 2026 timeline, from the first design meeting to the final walkthrough. Moisture remediation, egress excavation, and permit review are the items most likely to stretch a basement schedule.
| Phase | What happens | Typical Duration |
|---|---|---|
| Design & SelectionsPre-construction | Layout, egress, finishes, and fixtures finalized, and the moisture plan set, before any demolition begins. | 4 weeks |
| PermittingPre-construction | Plans submitted and reviewed by the city for electrical, plumbing, egress, and any structural work. Often overlaps design. | 2 to 6 weeks |
| ConstructionOn site | Drainage and sealing, egress and framing, insulation, rough-ins, drywall, then flooring, lighting, and finishes. | 6 to 10 months |
| TotalStart to finish | Design through final walkthrough, depending on scope. | 9 to 12 months |
Timelines vary with moisture remediation, egress, and permit review. We set and share the schedule before work starts.
We start with moisture, ceiling height, and how you actually want to use the lower level.
Design and construction under a single contract, with one project manager from day one.
Layout, egress, light, and storage are worked out on paper before anything is built.
Drainage, foundation sealing, and vapor control come before a single stud goes up.
Framed, insulated, permits pulled, inspections scheduled, and a one-year workmanship warranty.
In a Portland basement, moisture is the whole game. Get the drainage and vapor control right before you frame, and the finished space stays dry for decades.
Below grade in a wet climate, water always wins if you finish over it. Drainage, foundation sealing, and a vapor barrier come before any framing.
A basement bedroom needs a code-compliant egress window and well. Designing it in early avoids cutting concrete and digging later.
Ductwork, beams, and the 7-foot minimum shape the layout. We map the mechanicals before we draw a single wall.
Family-owned since 2008, design-build by default, and accountable from the first estimate to the final inspection.
Woodland completed a full basement remodel for us, two egress windows, a kitchenette, full bathroom, two bedrooms, a family room, and a laundry room. The egress windows brought in so much natural light, and the craftsmanship is top-notch. Delivered on time and within budget.
We had our 1,250 sq ft unfinished basement completely remodeled, a full bathroom, two bedrooms, and a family entertainment room with a custom bar and luxury hardwood. Tyrone and Anna listened to our ideas and made the process stress-free. We absolutely love it.
Great communication and very reliable work done by Tyrone. Would definitely hire again for future projects.
A basement remodel in Portland runs roughly $147K to $385K in 2026, depending on the size, whether you add a bedroom or bath, and how much moisture and structural work the basement needs. Finishing open living space starts around $147K. A full lower-level suite with an egress bedroom, a bath, and waterproofing, like a basement ADU conversion, lands in the upper range. Every client gets one fixed price after design, before any demolition begins.
Most Portland basement remodels take six to ten months of construction after a four week design and selections phase. Egress excavation, structural work, and permit review can stretch the schedule. We set the schedule before work starts and account for permits and inspections up front. Total time is usually nine to twelve months.
Yes. Oregon code requires a compliant egress window and window well for any basement room used as a bedroom, so it has a second way out in a fire. We design the egress in early, since cutting the foundation and digging the well is far easier to plan than to retrofit.
Moisture is the first thing we solve. Before any framing, we address the source: grading and downspouts outside, interior or exterior drainage and a sump where needed, foundation sealing, and a proper vapor barrier and insulation detail. Finishing over a damp basement is the most common reason a basement remodel fails, so we never skip it.
Yes, in almost every case. Finishing a basement in Portland involves electrical, often plumbing and HVAC, egress for bedrooms, and sometimes structural work, all of which require permits and inspections. As a licensed Oregon general contractor, CCB #181942, we pull the permits and manage the inspections for you. See more in our project gallery.
Woodland Construction Group is a design-build firm, so one team handles design and construction under a single contract. That means fewer handoffs, one project manager, and no designers and builders pointing fingers at each other. The layout, the egress, the systems, and the finishes are designed and built in-house. Learn more about our basement remodeling service.
Yes. Woodland Construction Group is a licensed, bonded, and insured Oregon general contractor, CCB #181942, family-owned in Portland since 2008. Every basement carries a one-year workmanship warranty.