Woodland Construction Group designs and builds finished basements in Portland and nearby cities, from $147,000 to $385,000 and 9 to 12 months.
A finished basement in Portland runs $147,000 to $385,000 in 2026. Most projects land between $181,000 and $202,000 for a 1,000 to 1,400 square foot living suite with a wet bar, full bathroom, and bedroom. ADU conversions reach $137,000 to $387,000 once you add a kitchen, separate entry, and code-required egress windows. The figure changes most with three variables: ceiling height (excavation or underpinning), moisture management scope, and finish level.
We work with homeowners in Portland, Beaverton, Bethany, Cedar Hills, Hillsboro, Lake Oswego, Tigard, West Linn and Milwaukie.
Most Portland basements were built to be ignored. The high-end ones get a second life: an in-law suite that pays the mortgage, a theater the kids actually use, a wine room that finally earns its square footage. Done right, it adds the equivalent of a full upper floor without changing the roofline.
Tyrell has run Portland basement and ADU projects since 2017, including pre-1940 daylight basements where ceiling height, knob-and-tube wiring, and waterproofing all had to be solved before framing could start. He owns the schedule and the budget on every basement we build.
A finished basement is the highest-leverage square footage in a Portland home. You already own the foundation, the slab, the perimeter walls. The job is to add light, height, and air, then build out from there.
Most clients come in describing one of these five. They sit at different price points, different permit paths, and very different finish levels. Knowing which one you're after sharpens the design phase from the first meeting.
The most common scope: a great room with a wet bar, powder bath, and built-in storage. Adds about 800 to 1,200 square feet of true living space.
Bedroom, full bath, sitting area, and kitchenette. Egress window is non-negotiable. Designed for a parent, an adult child, or long-term guests.
Climate-controlled cellar (55 to 58 degrees, 60 to 70 percent humidity), a tasting bar, racking for 800 to 2,400 bottles, and a tucked-away serving prep area.
Acoustically isolated theater with riser seating, plus a gym, sauna, or cold plunge in the adjacent zone. Sound and HVAC are the hard problems here.
Full kitchen, full bath, separate entry, dedicated electrical, and a permit certificate of occupancy. Rentable from day one.
None of these are required. All of them show up on the basements we're proudest of. We surface them in the design phase so you can choose what fits the budget and what waits for phase two.
Warm slab from the moment you take the stairs. Closed-loop PEX in 1.5-inch poured topping, zoned per room, sized for a 65-degree slab in February.
Full window-well excavation with a powder-coated steel surround and a horizontal-slider egress unit. Code-compliant and visually quiet from the yard.
Walnut or oak millwork, undercounter beverage column, U-Line clear-ice maker on a sound-isolated mount. Reads as a bar, not a kitchenette.
Double-stud wall, Green Glue between two layers of Type X drywall, resilient channel ceiling assembly. Sound-insulated shared walls and ceilings.
Whole-basement low-voltage dimming on a single Lutron RadioRA 3 keypad per room. Scenes for movie night, dinner party, kids reading, after midnight.
HVAC trunks, plumbing risers, and electrical panel relocated into a chase or moved upstairs. Ceiling reads flat, not industrial. Adds 4 to 6 inches of usable height.
The questions that matter at the kitchen table: What's behind the drywall? What happens in February when the ground saturates? Here's what the wall sections look like before the finishes go on.
Six inches of fall in the first ten feet. Downspouts to daylight or a dry well, never to grade. We document every line before we frame the first wall.
French drain in a 6-inch trench against the footing, sleeved gravel, fed to a sealed sump basin with a primary pump and a battery-backup secondary.
10-mil reinforced poly continuous from slab to band joist, taped at every seam. Closed-cell spray foam outboard of the framing for true thermal break.
DRIcore or Delta-FL panels lift the finished floor 1.5 inches off the slab, breaking thermal bridging and giving any incidental moisture somewhere to go.
State code minimum is 7 feet, with 6 feet 4 inches allowed under beams, ducts and pipes. Portland also accepts 6 feet 8 inches when converting existing space in a permitted house, but not for an ADU. Where an older basement falls short, relocating mechanicals or lowering the slab can gain height.
Required in every sleeping area: 5.7 square feet of openable area, 24-inch min height, sill no more than 44 inches off the finished floor.
HVAC trunks routed inside soffits, plumbing risers consolidated into a chase wall, panel relocated when needed. The ceiling plane stays flat.
Dedicated dehumidifier (Aprilaire E100 or larger), HRV for fresh air, MERV 13 filtration. Sized to keep indoor humidity under 50 percent.
Below-grade flooring has to handle vapor, thermal bridging, and the occasional minor incident. These are the three we specify for finished basements.
9-inch wide-plank European white oak, dimensionally stable over a sub-floor system. Reads as a primary floor, not a basement floor. Best for family lounges and ADUs.
Honed, densified, and sealed slab over hydronic radiant. Visually grounded, thermally connected, ideal for wine rooms and contemporary theaters.
24x48 rectified porcelain over Schluter Ditra-HEAT. Handles incidental moisture without damage, paired with wool rugs to soften the read. Suited to theater foyers and ADU baths.
Basements have more upstream variables than any other remodel: moisture, ceiling height, code, mechanical relocation, egress. Our 7-step process front-loads every one of them so the construction phase is execution, not problem-solving.
Free in-home consult and a walkthrough of the basement with you: the layout, ceiling height, mechanicals, egress and any signs of water. We talk through scope and budget before design starts.
Anna and the design team produce floor plans, elevations, and 3D walkthroughs, the full design phase in four weeks.
Material library presented, every selection priced, every line item visible. You see the budget for cabinetry, the budget for tile, the budget for the dehumidifier. Nothing rolls into a single allowance.
A structural engineer reviews any underpinning, beam relocation, or post-tension loading. We file with Portland Permitting & Development, manage every reviewer comment, and respond within 48 hours.
Existing finishes out, perimeter drain in, sump pump installed, vapor barrier and closed-cell foam applied. The hardest week of the project. Done before any framing begins.
Framing, mechanical rough-in, inspections, drywall, paint, flooring, millwork, fixtures, lighting, trim. One PM (Tyrell), one schedule, weekly Friday check-ins.
City final, certificate of occupancy (for ADUs), homeowner walkthrough with punch list. One-year workmanship warranty starts on close.
Featured Project · Hemlock A 1961 ranch in Hillsboro, remodeled as a 2,450 sq ft whole home remodel. The unfinished walkout basement became living space with a custom wine bar, and the work carried on through the rest of the house.
Basement-inclusive whole-home projects. Click through to the full case study in our project gallery.
Finishing a basement in Portland runs $147,000 to $385,000 in 2026. Most projects land between $181,000 and $202,000 for a living suite with a wet bar, full bath and bedroom. A finished basement adds about 800 to 1,200 square feet of living space.
Woodland Construction Group is a licensed design build contractor, CCB #181942. One team handles design, the permit application with Portland Permitting & Development, and construction. Tyrell Woodland, Senior Project Manager for basements and ADUs, runs the build.
A finished basement in Portland runs $147,000 to $385,000 in 2026. Most projects land between $181,000 and $202,000 for a full living suite (1,000 to 1,400 square feet) with a wet bar, full bath, and bedroom. ADU conversions reach $137,000 to $387,000 once you add a kitchen, separate entry, and code-required egress.
Most Portland basements built after 1970 can be converted to a legal ADU. The 2026 City of Portland code requires 7-foot ceiling minimum (6 feet 8 inches under beams), an egress window in any sleeping area, dedicated electrical service, and either an interior or exterior entry. Pre-1970 daylight basements often qualify after underpinning or window-well excavation. We'll know within one site visit whether yours is a candidate.
Every project starts with a walkthrough of the basement and a look at the exterior grading. We install a perimeter drain (interior or exterior depending on access), a continuous vapor barrier behind framing, closed-cell spray foam insulation, and a sealed sub-floor system that lifts finished flooring 1.5 inches above slab. Sump basin includes a battery-backup secondary pump.
Plan for 9 to 12 months from design start to final walkthrough. Design: 4 weeks. Structural engineering and permits: 3 to 6 weeks. Construction: 6 to 10 months. ADU conversions add 2 to 4 weeks for kitchen rough-in and a separate utility meter.
A legal basement ADU is rentable from day one, which is where most of the return comes from. A theater or wine room is more lifestyle than ROI.
Yes. When the basement floor sits below the main sewer line, we install a Liberty Pumps Pro380 or Saniflo Sanibest system with a sealed basin, alarm, and battery backup. We oversize the lift capacity for future fixture additions and run the discharge through a quiet-spec PVC riser inside a soffit.
Yes. Every basement sleeping area needs an egress window with 5.7 square feet of openable area, a minimum opening height of 24 inches, and a sill no more than 44 inches above the finished floor.
State code sets 7 feet for living space, with 6 feet 4 inches allowed under beams, ducts and pipes. Portland also accepts 6 feet 8 inches when converting existing space in a permitted house, but not for an ADU. Where an older basement falls short, relocating mechanicals or lowering the slab can gain height.
Most of our basement projects are within a 40-minute drive of our Pearl District office. Below are the metros and neighborhoods we book most often in 2026.
Free in-home consultation. We’ll reach out within 2 business days to schedule it. Now booking 2027 basement and ADU projects.
Keep Exploring