... Skip to main content
Portland Bathrooms  ·  Before & After

A 1950s pink bath, gutted and made calm.

Dated, boxed-in Portland bathrooms taken down to the studs and rebuilt in 2026. See the before and after, the cost ranges, the timeline, and how it came together.

5.0 Google Rating
CCB #181942 Oregon Licensed
18+ years In Portland
Portland Bathrooms

Older Portland homes, reworked around a calmer bathroom.

A Portland bathroom remodel starts with a familiar problem: dated tile and tight, walled-off layouts in mid-century, ranch, and Craftsman homes that were never built for how people actually use a bathroom in 2026. Every bathroom remodel we deliver follows NKBA design standards.

We take the room down to the studs, replace the substrate, waterproof it properly, move plumbing where the layout calls for it, and rebuild with new tile, a real vanity, and modern fixtures. The before and after below walks one of these West Hills baths.

One design-build team handles it all, from the first sketch to the final inspection, with an itemized estimate before any demolition begins.

Whitepine · West Hills, After West Hills bathroom after a remodel, white subway tile tub surround, marble-top double vanity, and a slate floor, Portland Oregon
18+
Years

Construction & design experience in Portland

500+
Projects

Portland-area homes transformed

5.0
Rating

Across Google, Houzz & Yelp reviews

2yr
Warranty

Craftsmanship warranty on every bathroom

Selected West-Side Bathrooms

Before & After

West Portland & Beaverton · Bathroom Remodels

Dated, closed-in west-side bathrooms, gutted and rebuilt around how they actually get used. The Berkshire baths, shown before and after, plus selected west-side projects: functional layouts, brilliant light, and finishes built to last.

Berkshire bathroom before remodel, dated tile-topped vanity with an almond drop-in sink and an oak medicine cabinet, Portland Oregon
Berkshire bathroom after remodel, frameless glass walk-in shower with a subway-tiled niche and brushed-brass fixtures, Portland Oregon
Berkshire · BeforeA tile-topped vanity, boxed in and dressed in dated beige.Before
Berkshire · Walk-In ShowerA frameless glass walk-in with a built-in niche, function in brilliant white.After
Berkshire bathroom before remodel, cramped powder bath with an oak vanity, cultured-marble sink, and striped wallpaper, Portland Oregon
Berkshire bathroom after remodel, white subway-tiled tub and shower with aged-brass fixtures over a marble hex-tile floor, Portland Oregon
Berkshire · The Old BathOak, wallpaper, and a cultured-marble sink, cramped and closed.Before
Berkshire · Tub & ShowerSubway tile to the ceiling on a marble hex floor, brass-lit and built to last.After
2026 Cost Tiers

What a Portland bathroom remodel actually costs.

Three tiers cover most Portland bathroom remodels in 2026. Where you land depends on the size, the fixtures, and whether the layout or plumbing moves. The table below maps each tier to what it includes and the range a typical bathroom runs.

TierWhat it includes2026 Range
RefreshGood New vanity, tile, toilet, lighting, and fixtures in the existing footprint. A tub-and-tile surround replaced like for like. $15K to $30K
Full RemodelBetter A new tile shower, a custom vanity, stone counters, new flooring, updated lighting and ventilation, and some layout changes. $30K to $55K
High-EndBest A gut to the studs, moved plumbing and walls, a curbless or wet-room shower, a freestanding tub, heated floors, and a full redesign. The Whitepine scope. $55K to $90K+

Ranges reflect a 2026 Portland metro bathroom remodel. A primary suite, moved plumbing, and high-end fixtures push above these tiers.

Project Timeline

How long a bathroom remodel actually takes.

Most of the schedule is locked before demolition. The phases below show a realistic 2026 timeline, from the first design meeting to the final walkthrough. Tile, vanity, and shower-glass lead times are usually the longest pole, so we order early.

PhaseWhat happensTypical Duration
Design & SelectionsPre-construction Layout, tile, vanity, fixtures, and finishes finalized before any demolition begins. 2 to 4 weeks
PermittingPre-construction Plans submitted and reviewed by the city when walls or plumbing move. Often overlaps design. 1 to 3 weeks
ConstructionOn site Demo, any plumbing and framing changes, waterproofing, tile, vanity and counters, then lighting and finishes. 3 to 6 weeks
TotalStart to finish Design through final walkthrough, depending on scope. 2 to 4 months

Timelines vary with project complexity and permit review. We set and share the schedule before work starts.

Design-Build Journey

How a Portland bathroom comes together.

I

Envision the space.

We start with how you actually use the bathroom, then picture what the room could become.

II

One team.

Design and construction under a single contract, with one project manager from day one.

III

Design together.

Layout, the shower, light, and storage are worked out on paper before anything is built.

IV

Select materials.

Tile, vanity, counters, and fixtures chosen and finalized before demolition. We order early.

V

Build it right.

Waterproofed properly, permits pulled, inspections scheduled, and a one-year craftsmanship warranty.

From the Field · West Hills
In an old tile bath, the waterproofing behind the tile is what fails first. Getting the substrate and the membrane right is what keeps the new shower sound for decades.
Woodland Construction Group  ·  Design-Build, CCB #181942
Field-Tested Tips

Three things we’d tell you before you start.

Tip No. 01

Get the waterproofing right.

Behind the pretty tile is a membrane and substrate that do the real work. Cutting that corner is what turns a remodel into a tear-out two years later.

Tip No. 02

Plan the ventilation.

Portland is wet. A correctly sized, properly vented exhaust fan keeps moisture, mold, and paint failure out of a brand-new bathroom.

Tip No. 03

Decide the shower first.

Curbed or curbless, glass or tile, niche placement and bench. The shower drives the plumbing, the framing, and where everything else lands.

What’s Included

Everything a bathroom remodel touches.

I

Layout & waterproofing.

  • Demo to the studs and subfloor
  • Moving plumbing and electrical
  • Membrane and substrate waterproofing
  • Shower and fixture layout
II

Surfaces & fixtures.

  • Tile shower, floor, and accent walls
  • Custom vanity and stone counters
  • Tub, shower, toilet, and faucets
  • Glass enclosure and hardware
III

Finishes & systems.

  • Ventilation and exhaust
  • Layered and task lighting
  • Heated floors where called for
  • Paint, trim, and final details
Why Woodland

The team Portland homeowners come back to.

Family-owned since 2008, design-build by default, and accountable from the first estimate to the final inspection.

★★★★★ 5.0 Google rating · 50+ reviews
Design-buildOne team, one contract, one project manager
Licensed & insuredOregon CCB #181942, bonded and insured
18+ years in Portland500+ metro-area homes since 2008
1-year warrantyCraftsmanship warranty on every bathroom
Itemized estimatesLine-by-line, within one business day
Honest pricingRanges up front, no surprises before demo
What Homeowners Say

Five-star, written by people who lived through it.

★★★★★
The single-PM thing is not marketing. We had one phone number from demo to final inspection. They caught failed waterproofing behind the old tile that nobody else flagged, and rebuilt it right.
David and Mei L.  ·  Beaverton
★★★★★
They took a cramped hall bath and made it feel twice the size without moving an exterior wall. The tile work is exactly the line we drew on the plans. A Portland bathroom done right.
Jen P.  ·  Hillsdale

A bathroom remodel in Portland runs roughly $15K to $90K-plus in 2026, depending on the size, the fixtures, and whether the layout or plumbing moves. A refresh with a new vanity, tile, and fixtures in the same footprint starts around $15K. A gutted primary bath with a custom shower, a freestanding tub, and moved plumbing, like the Whitepine bath in the West Hills, lands in the upper range. We give every client an itemized estimate before any demolition begins.

Most Portland bathroom remodels take three to six weeks of construction after a two to four week design and selections phase. Custom shower glass, vanities, and tile lead times can stretch the schedule, so we order early. We set the schedule before work starts and account for permits and inspections up front.

Yes. Many older Portland homes still have 1950s and 1960s tile baths, like the pink-tile Whitepine bathroom in the West Hills. We take the room down to the studs, replace the substrate, waterproof it correctly, move plumbing where the layout calls for it, and rebuild with new tile, a new vanity, and modern fixtures.

We remodel bathrooms across the Portland metro: the West Hills, Hillsdale, Multnomah Village, Alberta Arts, Sellwood, Beaverton, and Lake Oswego. Each area has its own mix of mid-century, ranch, and Craftsman homes, which shapes the layout, the waterproofing, and any structural work. See more in our project gallery.

Woodland Construction Group is a design-build firm, so one team handles design and construction under a single contract. That means fewer handoffs, one project manager, and no designers and builders pointing fingers at each other. The shower layout, the tile, the vanity, and the fixtures are designed and built in-house. Learn more about our bathroom remodeling service.

Yes. Woodland Construction Group is a licensed, bonded, and insured Oregon general contractor, CCB #181942, family-owned in Portland since 2008. Every bathroom carries a one-year craftsmanship warranty.

Ready When You Are

Your bathroom has a before and after in it too.

Tell us what is not working. We will walk your Portland bathroom, talk through 2026 options, and send an itemized estimate within one business day.

What to expect
  • 18+ years on Portland bathroom remodels
  • An in-home assessment of your space
  • A walk through your layout, needs, and budget
  • Design options and material guidance
  • An itemized estimate within one business day
Start your home remodeling project - request a free estimate
Close project form button